Arkema Lychee Project
- PROJECT DESCRIPTION
The electrical installation work scopes for this project comprises supply of non-free-issue materials, installation, testing & commissioning of electrical equipment and systems in the substations. The work scopes in process & offsite utility areas are as follows.
- Motor control stations
- Power junction boxes
- Welding & power socket outlets
- Convenience outlets
- Power & control cables
- Termination kits, cable glands, termination sockets and all accessories to complete cable installation
- Cable ladders, trays, support for cable ladders and trays below 300 mm & accessories
- Complete outdoor lighting system including but not limited to light fittings, street lighting, fence lighting, plant area lighting, lighting cables, JBs & accessories
- Aboveground earthing system
- Lightning protection System
- Heat tracing system
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Foster Wheeler (M) E & C Sdn Bhd
LOCATION: Terengganu, Malaysia
OWNER: Arkema Thiochemicals Sdn Bhd
DURATION: Aug 2013 - Jun 2014
Celanese VAE Project
- PROJECT DESCRIPTION
- One no. of pre-fabricated substation (21 meter length x 9.5 meter width x 4.5 meter height)
- Electrical transformer & panel installation
- Instrument console & cabinet installation
- AS-I system, foundation field bus, profile bus, modes bus installation & testing
- Purchase & installation of cable ladder, lighting fixture, cable Pulling & etc
- EPC of HVAC system for warehouse, lift motor room & pre-fabricated containerized substation
SCOPE OF WORK:
- Procurement & Construction – Electrical & Instrumentation
- EPC – HVAC & Containerised Substation
- Pre-commisioning, Testing & Commissioning
CLIENT: Celanese Singapore Emulsions Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Celanese Singapore Emulsions Pte Ltd
DURATION: Oct 2015 - Apr 2017
EVONIK ME5 Project (Electrical & Instrumentation Works)
- PROJECT DESCRIPTION
Electrical works:
- LV Switch Room
- Electrical field equipment installation
- Lighting junction boxes
- Weather proof socket outlets
- Earthing and Lightning
Instrumentation works:
- Control room Equipments
- Field Instruments
- Instrument Junction boxes
- Instrument Air-headers
- Cable Glands for Instrument works
- ELV Installation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Jacobs Engineering Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Evonik Methionine SEA Pte Ltd
DURATION: May 2013 - Aug 2014
Fujairah Oil Terminal
- PROJECT DESCRIPTION
Electrical & Instrumentation Works:
- MV/LV Substation
- MV Motors
- Field Instruments
- Fire & Gas Detector
- Panel Integration
- PLC Programming
- SCADA Screen Development
- Sub-System Integration
- Factory Acceptance Test
- Site Erection and Commissioning
- Training & Documentation
SCOPE OF WORK:
Construction:
1) Electrical & Instrumentation
CLIENT: Rotary Engineering Limited
LOCATION: Fujairah, UAE
OWNER: Fujairah Oil Terminal FZC
DURATION: May 2013 - Dec 2014
Jurong Synthetic Plant
- PROJECT DESCRIPTION
- Engineering ELV System
- Electrical work scope comprises supply of non free issue materials and installation, testing and commissioning of all electrical equipment including free issue and non free issue items, package electrics & systems
- Instrumentation work scope comprises supply of non free issue materials, calibration, installation, connecting, testing and pre-commissioning of instrument equipment and systems
SCOPE OF WORK:
- Procurement & Construction – Electrical & Instrumentation
- EPC – ELV
- Pre-commissioning, Testing & Commissioning
CLIENT: Amec Foster Wheeler Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Feb 2016 - Jan 2017
MLNG 3 EL2 Project
- PROJECT DESCRIPTION
Electrical & Instrumentation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: JGC - Kellog
LOCATION: Malaysia
OWNER: MLNG Tiga Sdn Bhd
DURATION: Jul 2001 - Mar 2002
MLNG Dua De-Bottlenecking Project (MDD), Electrical & Instrumentation Works for Module 4, 5 & 6
- PROJECT DESCRIPTION
Electrical & Instrumentation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Foster Wheeler
LOCATION: Malaysia
OWNER: Malaysia LNG Sdn Bhd
DURATION: Sep 2007 - Aug 2010
Neste Singapore Expansion Project
- PROJECT DESCRIPTION
- EPC of 22 no of tanks for Neste Singapore Plant Expansion
- Total capacity appx 180,000 cbm
SCOPE OF WORK:
Engineering Design, Procurement and Construction:
- Tankage
- Electrical & Instrumentation
CLIENT: Neste Singapore Pte Ltd
LOCATION: Singapore
OWNER: Neste Singapore Pte Ltd
DURATION: Feb 2019 - Nov 2020
PB Tankers Limited, Phase 6 Storage Tanks Development
- PROJECT DESCRIPTION
Electrical & Instrumentation Works:
- Panel Integration
- PLC Programming
- SCADA Screen Development
- Sub-System Integration
- Factory Acceptance Test
- Site Erection and Commissioning
- Training
- Documentation
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1) Electrical & Instrumentation
CLIENT: Rotary Engineering Limited
LOCATION: Pulau Busing, Singapore
OWNER: PB Tankers Limited
DURATION: Feb 2013 - Nov 2014