ENOC – Refinery Expansion – Tankage Facilities Project
- PROJECT DESCRIPTION
EPC of 12 tanks, with 450,000 cbm storage capacity. Scope includes associated civil works, piping connections (including tie-in to existing refinery), mechanical works, electrical and instrumentation works and fire-fighting facilities
SCOPE OF WORK:
Engineering Design, Procurement and Construction:
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: ENOC Processing Company (LLC) (EPCL)
LOCATION: JAFZA Dubai, UAE
OWNER: ENOC Processing Company (LLC) (EPCL)
DURATION: Mar 2017 - Jan 2019
Fujairah Oil Terminal
- PROJECT DESCRIPTION
- Total storage capacity of 1.15 million cbm
- Product storage tanks 34 nos., slop tanks 2 nos., utilities tanks 4 nos.
- Product jetty pipelines
- Common facilities & utilities, including E&I works
- Building works including administration building & substation
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
1. Civil
2. Tankage
3. Piping & Structures
4. Equipment Installation
5. Electrical & InstrumentationCLIENT: Concord Energy Pte Ltd
LOCATION: Fujairah, UAE
OWNER: Fujairah Oil Terminal FZC
DURATION: Nov 2012 - Dec 2014
Fujairah Oil Terminal – IMW Project
- PROJECT DESCRIPTION
Engineering, Procurement and Construction of the additional works which involved civil, piping (appx. 3000 BD) & structures, mechanical, electrical & instrumentation works.
SCOPE OF WORK:
Engineering, Procurement and Construction of the additional works:
- Civil
- Piping & structures
- Equipment installation
- Electrical & instrumentation
CLIENT: Fujairah Oil Terminal FZC
LOCATION: Fujairah, UAE
OWNER: Fujairah Oil Terminal FZC
DURATION: Jan 2015 - Feb 2016
Improved Water Quality Supply at Dhahran
- PROJECT DESCRIPTION
1 no. of new drinking water tank
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Tankage
CLIENT: Saudi Aramco
LOCATION: Dhahran, Saudi Arabia
OWNER: Saudi Aramco
DURATION: Mar 2015 - Apr 2016
Port of Fujairah – VLCC Jetty No. 1
- PROJECT DESCRIPTION
- Marine and jetty topside works
- 2.6 km twin crude lines 40” size
- Firefighting and utility
- Piping works (approx. 65000 DB)
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Civil
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Port of Fujairah
LOCATION: Fujairah, UAE
OWNER: Port of Fujairah
DURATION: Sep 2014 - Jul 2016
SABIC (SHARQ) – SHARQ 3rd Expansion
- PROJECT DESCRIPTION
- EPC works for 9 nos. of tanks, of which five are site-erected tanks & four are shop-fabricated tanks
- All are cone roof tanks T-8640 (20 meter diameter by 20 meter height)
- BTX storage tank with internal aluminum floater
- Tanks were designed according to API 650 & roof were designed according to API 620 due to climate conditions
- Job scopes include all works related to tanks, such as level indicators, instruments & foam chambers
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Tankage
- Piping & Structures
CLIENT: Shaw Stone & Webster Arabia (Project Management Control)
LOCATION: Jubail, Saudi Arabia
OWNER: SABIC (SHARQ)
DURATION: Sep 2007 - Sep 2009
SADARA – Isocyanates Tank Farm Project
- PROJECT DESCRIPTION
Shop fabrication of 10 nos. of Stainless Steels tanks.
SCOPE OF WORK:
Construction:
- Tankage
CLIENT: SADARA / Daelim
LOCATION: Jubail, Saudi Arabia
OWNER: SADARA / Daelim
DURATION: May 2014 - Aug 2014
SADARA – Mixed Feed Cracker Project
- PROJECT DESCRIPTION
Shop fabrication & field erection of 13 nos. of tanks
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Tankage
CLIENT: SADARA / Daelim
LOCATION: Jubail, Saudi Arabia
OWNER: SADARA / Daelim
DURATION: Jun 2012 - Oct 2013
SADARA – South Tank Farm Project
- PROJECT DESCRIPTION
Site erection of 28 nos. of tanks (include 5 nos. of Stainless Steels tanks & 2 nos. of double wall tanks)
SCOPE OF WORK:
Construction:
- Tankage
CLIENT: SADARA / Daewoo E&C
LOCATION: Jubail, Saudi Arabia
OWNER: SADARA / Daewoo E&C
DURATION: Jul 2013 - Feb 2015