CCD (Singapore) – AAL and VAM Plant
- PROJECT DESCRIPTION
Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation.
- Total storage facility of 60,000 cbm
- 325,000 DB of piping fabrication & erection works
- 4,400 tons of steel structure fabrication & erection and 11 stainless steel tanks
- 4,800 tons of equipment installation including towers & columns
- Electrical & instrumentation works
- Total of 19 nos. carbon steel fixed roof tanks, 1 marine jetty topsite
SCOPE OF WORK:
Construction:
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: CCD (Singapore) Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: CCD (Singapore) Pte Ltd
DURATION: Nov 2011 - Jun 2013
Celanese VAE Project
- PROJECT DESCRIPTION
- One no. of pre-fabricated substation (21 meter length x 9.5 meter width x 4.5 meter height)
- Electrical transformer & panel installation
- Instrument console & cabinet installation
- AS-I system, foundation field bus, profile bus, modes bus installation & testing
- Purchase & installation of cable ladder, lighting fixture, cable Pulling & etc
- EPC of HVAC system for warehouse, lift motor room & pre-fabricated containerized substation
SCOPE OF WORK:
- Procurement & Construction – Electrical & Instrumentation
- EPC – HVAC & Containerised Substation
- Pre-commisioning, Testing & Commissioning
CLIENT: Celanese Singapore Emulsions Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Celanese Singapore Emulsions Pte Ltd
DURATION: Oct 2015 - Apr 2017
Changi Airport Fuel Hydrant Installation (CAFHI)
- PROJECT DESCRIPTION
Civil & mechanical works:
- 2 kilometer pipeline with capping beam
- 33 fuel hydrants
- 5,200 DB for shop & field piping installation
- Construction of 4 main valve chambers
- Underground piping works include sheet piling, reinforced concrete piling, excavation, backfilling, concrete & steel bar reinforcement
- Pipe-jacking for the tie-in area
- Pre-commissioning works
SCOPE OF WORK:
Construction & Pre-commisioning:
- Civil
- Piping
CLIENT: Changi Airport Fuel Hydrant Installation Pte Ltd
LOCATION: Changi Airport Terminal 4, Singapore
OWNER: Changi Airport Fuel Hydrant Installation Pte Ltd
DURATION: Jan 2015 - Feb 2017
Croda Alkoxylation Project
- PROJECT DESCRIPTION
Mechanical, structure & piping package
- 21,803 DB for shop & field piping installation
- 228 tons of steel structure
- 79 units of equipment installation
SCOPE OF WORK:
Construction:
- Piping & Structures
- Equipment Installation
CLIENT: Croda Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Croda Singapore Pte Ltd
DURATION: Jun 2014 - Feb 2015
EVONIK ME5 Project (Electrical & Instrumentation Works)
- PROJECT DESCRIPTION
Electrical works:
- LV Switch Room
- Electrical field equipment installation
- Lighting junction boxes
- Weather proof socket outlets
- Earthing and Lightning
Instrumentation works:
- Control room Equipments
- Field Instruments
- Instrument Junction boxes
- Instrument Air-headers
- Cable Glands for Instrument works
- ELV Installation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Jacobs Engineering Singapore Pte Ltd
LOCATION: Jurong Island, Singapore
OWNER: Evonik Methionine SEA Pte Ltd
DURATION: May 2013 - Aug 2014
EVONIK ME5 Project (Pipe Rack Module Work)
- PROJECT DESCRIPTION
Mechanical, structure & piping package
- 20,000 DB for shop & field piping installation
- 1,000 tons of steel structure
- 2,500 linear meter piping insulation
- Supply, fabrication & insulation of cable tray in pipe rack modules
- 5,540 linear meter electrical cable & conduit works
- 2,160 linear meter instrument tray & conduit works
SCOPE OF WORK:
Construction:
- Piping & Structures
- Electrical & Instrumentation
CLIENT: Jacobs Engineering
LOCATION: Jurong Island, Singapore
OWNER: Evonik Methionie SEA Pte Ltd
DURATION: Jan 2013 - Sep 2014
GMR Energy 2 x 400 MW CCP Project
- PROJECT DESCRIPTION
- BOP Mechanical & Piping Works (PACKAGE 2)
- EPC 7 tanks for Fuel Oil, NeWater, Fire Water and Demin. Water (105,250 cbm); Tank construction works mainly include general fitting, welding works, Pipes and fittings erection.
- Shop fabrication and site erection of BOP piping (SS & CS) of around 55,000 DB.
- Site erection of heavy equipments of around 1,100 tons.
- Testing and pre-commissioning of the system to ensure plant readiness for energisation, and provide skilled manpower support to Samsung C&T (Main Contractor) for the commissioning works
SCOPE OF WORK:
Engineering Design, Procurement and Construction:
- Tankage
- Mechanical & Piping
CLIENT: Samsung C&T
LOCATION: Jurong Island , Singapore
OWNER: Samsung GMR
DURATION: Sep 2011 - Jul 2013
Jurong Grease Plant
- PROJECT DESCRIPTION
- 52 nos. of shop fabricated tanks
- Production building
- Piping works, mechanical equipment installation
- Civil works including early works, substation building & etc.
- Electrical & instrumentation works
SCOPE OF WORK:
Procurement and Construction:
- Civil & Structural
- Tankage
- Piping & Structures
- Mechanical Equipment Installation
- Electrical & Instrumentation
CLIENT: Exxon Mobil Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Mar 2015 - Oct 2016
Jurong Synthetic Plant
- PROJECT DESCRIPTION
- Engineering ELV System
- Electrical work scope comprises supply of non free issue materials and installation, testing and commissioning of all electrical equipment including free issue and non free issue items, package electrics & systems
- Instrumentation work scope comprises supply of non free issue materials, calibration, installation, connecting, testing and pre-commissioning of instrument equipment and systems
SCOPE OF WORK:
- Procurement & Construction – Electrical & Instrumentation
- EPC – ELV
- Pre-commissioning, Testing & Commissioning
CLIENT: Amec Foster Wheeler Asia Pacific Pte Ltd
LOCATION: Shipyard Road, Singapore
OWNER: Exxon Mobil Asia Pacific Pte Ltd
DURATION: Feb 2016 - Jan 2017