Arkema Lychee Project
- PROJECT DESCRIPTION
The electrical installation work scopes for this project comprises supply of non-free-issue materials, installation, testing & commissioning of electrical equipment and systems in the substations. The work scopes in process & offsite utility areas are as follows.
- Motor control stations
- Power junction boxes
- Welding & power socket outlets
- Convenience outlets
- Power & control cables
- Termination kits, cable glands, termination sockets and all accessories to complete cable installation
- Cable ladders, trays, support for cable ladders and trays below 300 mm & accessories
- Complete outdoor lighting system including but not limited to light fittings, street lighting, fence lighting, plant area lighting, lighting cables, JBs & accessories
- Aboveground earthing system
- Lightning protection System
- Heat tracing system
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Foster Wheeler (M) E & C Sdn Bhd
LOCATION: Terengganu, Malaysia
OWNER: Arkema Thiochemicals Sdn Bhd
DURATION: Aug 2013 - Jun 2014
Chevron Pulau Indah & Chevron Seberang Perai – Tank Repair/Cleaning & Maintenance Works
- PROJECT DESCRIPTION
- Cleaning of Storage Tanks
- Major & Minor Repairs & Modifications
- Undertake Miscellaneous Works
- Tank Repair/Refurbishment
- Tank Internal cleaning & De-sludging
- Provide Storage & Disposal for Waste Oil
- Tank Internal & External Grit Blasting & Painting
- Internal & External Scaffolding
- Manpower Supply
- Supply of Materials & Equipment
- Tank Pad/Foundation Repair/Refurbishment
- Tank Piping Works Repair/Modifications
- Foam Piping Works Repair/Modifications
- Tank Cooling Works Repair/Modifications
- Platforms & Walk Ways
- Calibration of Tank
- Hydrostatic/Vacuum Testing & Commissioning
SCOPE OF WORK:
Civil, Mechanical & Electrical Maintenance Works
CLIENT: Chevron Malaysia Limited
LOCATION: Penang & Selangor, Malaysia
OWNER: Chevron Malaysia Limited
DURATION: Jun 2012 - May 2016
Map Ta Phut MOC Cracker Plant II (Tank Farm Unit)
- PROJECT DESCRIPTION
- Basic & detailed engineering for 9 nos. of Spherical and 11 nos. of Atmospheric Tanks
- Spherical Tanks under ASME Sect VIII Div II; Atmospheric Tanks under API 650/651 code
- Spherical Tanks products: HP Ethylene/Propylene & C4
- Atmospheric Tanks products: Cracker bottom, mixed Xylene, Naphtha, Benzene, Toluene, Pyrolysis Gasoline
- Capacity of TFU – 190,000 cum; Tanks (empty weight) – 9,600 Tons; Piping – 150,000 DB
Safety man-hours w/o LTI – 4,800,000 mhrs - Design & supply of materials, fabrication and erection of tanks, testing, inspection & pre-commissioning
- Design for spherical tank based on ASME Div II which results in material cost saving for client, via use of thinner tank plate materials
SCOPE OF WORK:
Engineering Design, Procurement & Construction
- Civil
- Tankage
- Piping & Structures
- Equipment Installation
- Electrical & Instrumentation
CLIENT: Map Ta Phut Olefins Co. Ltd. (Siam Cement Group)
LOCATION: Rayong, Thailand
OWNER: Map Ta Phut Olefins Co. Ltd. (Siam Cement Group)
DURATION: Jan 2007 - Apr 2009
MLNG 3 EL2 Project
- PROJECT DESCRIPTION
Electrical & Instrumentation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: JGC - Kellog
LOCATION: Malaysia
OWNER: MLNG Tiga Sdn Bhd
DURATION: Jul 2001 - Mar 2002
MLNG Dua De-Bottlenecking Project (MDD), Electrical & Instrumentation Works for Module 4, 5 & 6
- PROJECT DESCRIPTION
Electrical & Instrumentation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: Foster Wheeler
LOCATION: Malaysia
OWNER: Malaysia LNG Sdn Bhd
DURATION: Sep 2007 - Aug 2010
Padauk Shwe War Terminal
- PROJECT DESCRIPTION
- EPC of a tank farm with 8 numbers of tank facility for storage of petroleum products
SCOPE OF WORK:
Engineering Design,
Procurement and Construction:
1.Civil
2.Tankage
3.Piping & Structures
4.Equipment Installation
5.Electrical & Instrumentation
CLIENT: Padauk Shwe War Port and Petroleum Co., Ltd
LOCATION: Myanmar
OWNER: Padauk Shwe War Port and Petroleum Co., Ltd
DURATION: Nov 2018 - Apr 2020
Proposed Petroleum Storage and Handling Facilities (Phase 2) for JPTT at Jurong Port
- PROJECT DESCRIPTION
- Construction of a proposed terminal with 19 number of tanks suitable for the storage, transfer and blending of petroleum products, valve manifolds, firefighting system, slop and wastewater system, utilities, buildings, jetty topsides, and interconnecting pipeline from Jurong Port Tank.
- A total capacity of 310,000 cmb with no new jetties in Phase 2 scope. Supported by Phase 1 existing jetties.
SCOPE OF WORK:
Engineering Design,
Procurement and Construction:
1.Civil
2.Tankage
3.Piping & Structures
4.Equipment Installation
5.Electrical & Instrumentation
CLIENT: Jurong Port Tank Terminals Pte Ltd
LOCATION: Singapore
OWNER: Jurong Port Tank Terminals Pte Ltd
DURATION: Sept 2019 - Oct 2022
Provision for Engineering, Procurement, Construction & Commissioning of PC 12409 for MLNG – Bintulu, Sarawak, Malaysia
- PROJECT DESCRIPTION
Mechanical & Piping:
- Required to supply of management, manpower, tools, equipment, transportation, consumable and PPE.
- Supply crane, trailer & lorry crane for the lifting works and supply all lifting equipment such as chain block, shackle and sling belt.
- Supply of welding generator (Diesel driven) accessories and consumable.
- All temporary spades and blinds
- Torque Machine and manual torque tool
- Carry out hydrotest
- Fabricate & install pipe support and piping
- Control valve removal installation new C/V
Electrical & Instrumentation Work:
- Supply of calibration equipment & Testing equipment
- Precommissioning works (Loop check & calibration)
- Control valve functional check new c/v
- Supply of welding generator accessories and consumables
- Fabricate and install pipe support
Automation DCS Works in MFS2, MPCC Control room scope limited to serial link connection from LCP to MFS2, Development of Graphics screen at MFS2.
SCOPE OF WORK:
Engineering Design, Procurement & Construction:
- Mechanical & piping
- Electricial & Instrumentation
CLIENT: Maser (M) Sdn Bhd
LOCATION: Bintulu, Sarawak
OWNER: Malaysia LNG Sdn Bhd
DURATION: Jan 2013 - Apr 2014
Provision of Manpower & Equipment Supply for E&I Assistance in Existing, Common Areas for Train 7 & 8 including Shutdown for MLNG
- PROJECT DESCRIPTION
Electrical & Instrumentation Works
SCOPE OF WORK:
Procurement & Construction:
- Electrical & Instrumentation
CLIENT: JGC - Kellog
LOCATION: Malaysia
OWNER: MLNG Tiga Sdn Bhd
DURATION: Jul 2003 - Dec 2003