Neste Oil Singapore – Neste Biofuel Project

  • Total of 11 tanks, including shop fabrication and site erection. Tank materials are CS, SS and duplex
  • Total of 117,126 DB of piping fabrication and erection works
  • Installation of 36 equipment totalling 207 tons
  • Electrical & instrumentation works include grounding and lighting, installation of substation, cable tray, cable ladder, CP protection and heat tracing systems

Shell Mono Ethylene Glycol (MEG) Plant

  • 200,000 DB shop fabrication & field installation of pipes
  • Pipe sizes ranging from 2” to 88”
  • Equipment installation of 480 nos. ranging from 2 tons to 1,200 tons

Shell Mono Ethylene Glycol (MEG) Plant

  • EPC works for 750,000 cbm TPA Mono Ethylene Glycol (MEG) downstream plant in Jurong Island
  • Scope of work include mechanical construction, piping & equipment installation
  • Shop fabrication & field Installation of estimated 200,000 DB of pipes
  • Pipe sizes range from 2” to 88”
  • Equipment installation of 486 nos. ranging from 2 tons to 1,200 tons
  • Engineering lifting studies for heavy lifts & piping spoolgen drawings for shop fabrication

Singapore Parallel Train

Electrical works:

  • Utility Substations with MV Transformers & LV Transformers
  • Air Cooler & Olefins Substations with MV Transformers & LV Transformers
  • 120MW Gas Turbine Generators (GE Make) with 150MVA GSU Transformers
  • Auxiliary Transformers & Iso-Phase Bus Duct System
  • GTG Migration
  • GLAC Erection/Installation Check
  • GNAC Erection/Installation Check
  • MV Motors (6.6kV) & LV Motors (433V)
  • MV & LV Switchgears
  • MCCs & Distribution Panels
  • Plant Lighting & Power System
  • Cathodic Protection System
  • Electrical Heat Tracing System
  • Cable Ladder / Tray System
  • UPS System / Battery
  • Grounding System
  • Standby Generator
  • Substation System
  • Preservation

Instrumentation works:

  • Instrument Cable System
  • Air Supply Tubing System
  • Loop Foder / Assembly Procedure
  • RIE Installation
  • Analyzer Container Installation
  • Instrument Calibration

Singapore Parallel Train

Mechanical, structural & piping package

  • 337,000 DB piping fabrication & erection
  • 7,900 tons of steel structure erection
  • 127,000 DB small bore fabrication
  • 667 units of equipment installation
  • Underground piping works include excavation, backfilling, concrete & steel bar reinforcement

Singapore Parallel Train

  • 337,000 DB piping fabrication & erection works
  • 7,900 tons of steel structure erection
  • 127,000 DB of small bore fabrication works
  • 667 units of equipment installation
  • Underground piping works including excavation, backfilling, concrete & steel bar reinforcement
  • Electrical & instrumentation works