- 65,500 DB for shop & field piping installation
- 3,000 tons of steel structure
- 7,115 linear meter of pipe insulation
Project Type: Process Plant
CCD (Singapore) – AAL and VAM Plant
- 325,000 DB small & large bore fabrication and installation of piping for the plant
- 4,400 tons of structural works
- 268 units of equipment installed (4800 tons of equipment installation including towers & columns)
CCD (Singapore) – AAL and VAM Plant
Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation.
- Total storage facility of 60,000 cbm
- 325,000 DB of piping fabrication & erection works
- 4,400 tons of steel structure fabrication & erection and 11 stainless steel tanks
- 4,800 tons of equipment installation including towers & columns
- Electrical & instrumentation works
- Total of 19 nos. carbon steel fixed roof tanks, 1 marine jetty topsite
TOTAL Oil Asia-Pacific – Lube Oil Blending Plant
Electrical works:
- LV Panel
- UPS
- Distribution Board
- Heat Tracing System
- Engineering Smoke Control System
- HVAC
Instrumentation works:
- Control room Equipments
- PLC Programming
- Field Instruments
- Weighbridge System
- Vehicle Entry /Exit barrier System
- Instrument Power and Signal Cables
- Instrument Junction Box & Cable Glands
- ELV Installation Works
TOTAL Oil Asia-Pacific – Lube Oil Blending Plant
Shop fabrication & site erection of 56 nos. Carbon Steel tanks with 9,800 cbm storage capacity.
TOTAL Oil Asia-Pacific – Lube Oil Blending Plant
Mechanical, structural & piping package
- 80,000 DB for shop & field piping installation
- 1,400 Tons of steel structure
- 90 units of equipment installation
TOTAL Oil Asia-Pacific – Lube Oil Blending Plant
- 300,000 MTPA lube oil blending plant
- 39 nos. of tanks in the tank farms
- 80,000 DB of piping works, including pipe lines to the shared facility
- Production building, truck loading and unloading bays, office building with parking facilities, miscellaneous buildings and utilities
Shell Eastern Petroleum – Shell Houdini Bukom Refinery Modification (HV5 ISBL)
- Modification works related to Shell Bukom Refinery (HV5)
- Piping fabrication & erection works
- Steel structure erection works
- Equipment installation works
Shell Eastern Petroleum – Shell Ethylene Cracker Complex
- 26 nos. of atmospheric tanks
- Tank materials are carbon steels & stainless steels
- E&I works include grounding & lighting, installation of substation, cable tray & cable ladder
Nexsol Singapore – Nexsol Biodiesel Plant
- Plant capacity: Biodiesel 100,000 TPA, Glycerine 10,000 TPA
- EPC of bio-diesel plant and its related facilities
- Detailed engineering work for civil, structural, piping, tankage, equipment sizing, electrical & instrumentation works
- Procurement of tank farm equipment such as pumps, loading arms & utility equipment, firefighting equipment, tank plates, tank accessories, piping, fittings, valves, electrical bulk material and equipment & instruments
- Civil works include site preparation, process plant, tank pad, paraquet wall, pipe sleepers & etc
- Structural works include fabrication & installation of process plant structure, platforms, pipe supports, pipe bridge & etc
- Installation & alignment of the mechanical equipment
- Optimization of equipment usage, ease of installation work by proper sequencing of process plant equipment & pipe installation sequence