CCD (Singapore) – AAL and VAM Plant

  • 325,000 DB small & large bore fabrication and installation of piping for the plant
  • 4,400 tons of structural works
  • 268 units of equipment installed (4800 tons of equipment installation including towers & columns)

CCD (Singapore) – AAL and VAM Plant

Detailed engineering work for tankage, civil, equipment sizing, piping, electrical & instrumentation.

  • Total storage facility of 60,000 cbm
  • 325,000 DB of piping fabrication & erection works
  • 4,400 tons of steel structure fabrication & erection and 11 stainless steel tanks
  • 4,800 tons of equipment installation including towers & columns
  • Electrical & instrumentation works
  • Total of 19 nos. carbon steel fixed roof tanks, 1 marine jetty topsite

TOTAL Oil Asia-Pacific – Lube Oil Blending Plant

Electrical works:

  • LV Panel
  • UPS
  • Distribution Board
  • Heat Tracing System
  • Engineering Smoke Control System
  • HVAC

Instrumentation works:

  • Control room Equipments
  • PLC Programming
  • Field Instruments
  • Weighbridge System
  • Vehicle Entry /Exit barrier System
  • Instrument Power and Signal Cables
  • Instrument Junction Box & Cable Glands
  • ELV Installation Works

TOTAL Oil Asia-Pacific – Lube Oil Blending Plant

  • 300,000 MTPA lube oil blending plant
  • 39 nos. of tanks in the tank farms
  • 80,000 DB of piping works, including pipe lines to the shared facility
  • Production building, truck loading and unloading bays, office building with parking facilities, miscellaneous buildings and utilities

Nexsol Singapore – Nexsol Biodiesel Plant

  • Plant capacity: Biodiesel 100,000 TPA, Glycerine 10,000 TPA
  • EPC of bio-diesel plant and its related facilities
  • Detailed engineering work for civil, structural, piping, tankage, equipment sizing, electrical & instrumentation works
  • Procurement of tank farm equipment such as pumps, loading arms & utility equipment, firefighting equipment, tank plates, tank accessories, piping, fittings, valves, electrical bulk material and equipment & instruments
  • Civil works include site preparation, process plant, tank pad, paraquet wall, pipe sleepers & etc
  • Structural works include fabrication & installation of process plant structure, platforms, pipe supports, pipe bridge & etc
  • Installation & alignment of the mechanical equipment
  • Optimization of equipment usage, ease of installation work by proper sequencing of process plant equipment & pipe installation sequence