Jurong Synthetic Plant

  • Engineering ELV System
  • Electrical work scope comprises supply of non free issue materials and installation, testing and commissioning of all electrical equipment including free issue and non free issue items, package electrics & systems
  • Instrumentation work scope comprises supply of non free issue materials, calibration, installation, connecting, testing and pre-commissioning of instrument equipment and systems

Jurong Grease Plant

Shop fabrication of 52 nos. of cone roof tanks with  2,800 cbm storage capacity.

Jurong Grease Plant

  •  52 nos. of shop fabricated tanks
  • Production building
  • Piping works, mechanical equipment installation
  • Civil works including early works, substation building & etc.
  • Electrical & instrumentation works

Shell Marina Project

Mechanical & piping package

  • Carried out scoping work
  • 7,000DB shop & field piping installation
  • Carried out alignment of 119 nos. of pumps

Croda Alkoxylation Project

Mechanical, structure & piping package

  • 21,803 DB for shop & field piping installation
  • 228 tons of steel structure
  • 79 units of equipment installation

EVONIK ME5 Project (Electrical & Instrumentation Works)

Electrical works:

  • LV Switch Room
  • Electrical field equipment installation
  • Lighting junction boxes
  • Weather proof socket outlets
  • Earthing and Lightning

Instrumentation works:

  • Control room Equipments
  • Field Instruments
  • Instrument Junction boxes
  • Instrument Air-headers
  • Cable Glands for Instrument works
  • ELV Installation Works

EVONIK ME5 Project (Pipe Rack Module Work)

Mechanical, structure & piping package

  • 20,000 DB for shop & field piping installation
  • 1,000 tons of steel structure
  • 2,500 linear meter piping insulation
  • Supply, fabrication & insulation of cable tray in pipe rack modules
  • 5,540 linear meter electrical cable & conduit works
  • 2,160 linear meter instrument tray & conduit works