Stepan Asia Pte Ltd – Stepan Phase 1 Project

Construction of a five-storey 50,000 tons (expandable to 100,000 tons) per year (“TPY”) Fractionated Methyl Ester (“ME”) plant

Also upgrading of an existing ME plant on Jurong Island.

Works include the addition of tanks, cooling tower, air compressor, fire-fighting facilities

Related facilities involving civil, structural, mechanical, piping, electrical and instrumentation works.

Celanese VAE Project

  • One no. of pre-fabricated substation (21 meter length x 9.5 meter width x 4.5 meter height)
  • Electrical transformer & panel installation
  • Instrument console & cabinet installation
  • AS-I system, foundation field bus, profile bus, modes bus installation & testing
  • Purchase & installation of cable ladder, lighting fixture, cable Pulling & etc
  • EPC of HVAC system for warehouse, lift motor room & pre-fabricated containerized substation

SRC Mogas Cogen Plant

Electrical works:

  • Electrical Equipment Installation
  • Electrical Testing
  • Transformer Modification
  • ISO-Phase Bus Duct Installation
  • Refinery Lighting
  • 22kV Live Cables Trench Excavation
  • Electrical Cable Splicing , Termination & OWTS Testing’s
  • 22kV Cut-Over Works w/ Cogen Sub Station
  • Site Erection and Commissioning