RotaryTerminalProposed Petroleum Storage & Handling Facilities For Jurong Port Tank Terminals (Phase 1) At Jurong Port Proposed Petroleum Storage & Handling Facilities For Jurong Port Tank Terminals (Phase 1) At Jurong Port
- Construction of a tank farm with 19 numbers of tanks for clean petroleum products storage, pump stations, valve manifolds, firefighting system, slop and waste water system, utilities, buildings, jetty topsides, and interconnecting pipeline from Jurong Port Tank Terminal to Oiltanking’s tank terminal
- Total storage facility of 232,000 cbm with potential to add another 230,000 cbm
- Supported by 4 jetty berths with 16 meter draft and can facilitate vessel berthing up to 120,000 deadweight ton. The scope includes installation 6 numbers of marine loading arms and gangway tower with jib crane
- Building works include CCR & admin building, warehouse & workshop and substation