Neste Oil Singapore – Neste Biofuel Project
- Total of 11 tanks, including shop fabrication and site erection. Tank materials are CS, SS and duplex
- Total of 117,126 DB of piping fabrication and erection works
- Installation of 36 equipment totalling 207 tons
- Electrical & instrumentation works include grounding and lighting, installation of substation, cable tray, cable ladder, CP protection and heat tracing systems