Rotary Engineering Limited

About Rotary

Petrochemical

SOP Project

SOP Project

Client:

Kellogg Overseas Chiyoda Corp

Owner:

Kellogg Overseas Chiyoda Corp

Construction Period:

1999 - 2000

Scope of Work:

Electrical & Instrumentation

Location:

Jurong Island, Singapore

Brief Description:

  • Electrical works include laying of high voltage and low voltage cabling works.
  • High voltage – testing works.
  • Instrument calibration and checking, both bench and field calibration
  • Field instrument installation, including junction box, analyer and CCTV DCS panel and rack installation.
  • Fibre optic cable laying.
  • Air piping and signal tubing installation.
  • Cableway installation, tray, ladder and conduit.
  • Steam tube line installation .
  • Loop and sequence check.
  • Fibre optic cable laying.
  • DCS's system integration test/system acceptance test.
  • Pre-commissioning and commissioning.
  • Post-commissioning maintenance and support services.
Testimonials:

"Without Rotary's acceptance of our higher than normal manpower and equipment demands, we would not have been able to meet our very short schedule with the quality installation we accomplished. Your team did an excellent job of coming through and meeting our ‘world class' schedule with exceptional quality." --- Sam Horton, Resident Construction Manager of Kellogg Overseas Corporation, on the Singapore Syngas Gasification Hub Project.