Pfizer Bulk Pharmaceutical Chemical Facility Project

  Client : Jacobs Lend Lease Pte Ltd

Owner: Pfizer Asia Pacific Pte Ltd

Construction Period : April 2001 to September 2001

Scope of Work : Electrical and Instrumentation Works

Location : Tuas South, Singapore

 
   

BRIEF DESCRIPTION:

Construction of 4 tanks.
2 firewater tanks with dimension of 12 m diameter x 16 m height; 1 process
water tank with a dimension of 10 m high x 8.4 m diameter; 1 low grade water tank.
Pump installation work.
Fabrication, installation, and welding of carbon steel pipes.
Pre-fabrication and site installation of tanks .

 

 

Bulk Pharmaceutical Manufacturing Facility Project

  Client : Yonkers Industries Inc.


Owner: Schering Plough Limited

Construction Period : March 1996 to November 1996

 
Scope of Work : Design, Supply, Fabrication, Erection and Testing of Tanks

Location : Tuas West, Singapore

    
BRIEF DESCRIPTION:

Engineering, procurement, fabrication and erection of field erected tanks.
Painting works.
Insulation works.
Hydro-testing .

 