"Without Rotary’s acceptance of our higher than normal manpower and equipment demands, we would not have been able to meet our very short schedule with the quality installation we accomplished. Your team did an excellent job of coming through and meeting our ‘world class’ schedule with exceptional quality."

Sam Horton
Resident Construction Manager of Kellogg Overseas Corporation, on the Singapore Syngas Gasification
Hub Project.

SOP Project

  Client : Kellogg Overseas Chiyoda Corp

Owner: Exxon Mobil

Construction Period : 1999 - 2000

Scope of Work : Electrical & Instrumentation

Location : Jurong Island, Singapore

 

BRIEF DESCRIPTION:

Electrical works include laying of high voltage and low voltage cabling works.
High voltage –testing works.
Instrument calibration and checking, both bench and field calibration
Field instrument installation, including junction box, analyer and CCTV
DCS panel and rack installation.
Fibre optic cable laying.
Air piping and signal tubing installation.
Cableway installation, tray, ladder and conduit.
Steam tube line installation .
Loop and sequence check.
Fibre optic cable laying.
DCS’s system integration test/system acceptance test.
Pre-commissioning and commissioning.
Post-commissioning maintenance and support services.

 

 

Control Systems Modernization (CSM) Project

  Client : Foster Wheeler Eastern Pte Ltd


Owner: ExxonMobil Asia Pacific Pte. Ltd

Construction Period : August 2001 to May 2002

 
Scope of Work : Fabrication of a Remote Instrument Enclosure (RIE)
Location : Jurong Island, Singapore

BRIEF DESCRIPTION:

Construction of a Remote Instrument Enclosure using Powell "POW-R-LOK" wall concept.
Installation of distributed control system interface cabinets (containing field I/O cards),
termination panels, instruments protection material, and power systems within the RIE.
The interior walls of the RIE are used for mounting FTAs, wire ducting and field
terminations with access to the computer floor and external cable ducts. The marshalling
area enclosures utilizes sliding door with rigid frame to house the field I/O cards.
The RIE is equipped with two air conditioning units (100% redundancy) and a
pressurization unit for the control of temperature, pressure and cleanliness of air.

 