[ page 1 ] [ page 2 ] [ page 3 ] [ overseas projects ]

" As we continue to work with Rotary, we can attest to the strength of the management, their project planning, strategy and implementation, which are altogether effective, thorough, creative and meet our needs completely."

Jack Hamilton
Du Pont Singapore Pte. Ltd., Construction Manager.

"I like to thank Rotary for the excellent job your staff delivered to us in relation to our Pulau Sakra Terminal Project. We appreciate all the cooperation and efforts made by you and your
capable people."


Ben Vree
Managing Director of Van Ommeren Tank Terminal(S) Pte. Ltd., on the Votts Pulau Sakra Project at Pulau Sakra.

Pulau Sakra Project

  Client : Van Ommeren Tank Terminal (S) Pte Ltd


Owner: Du Pont Singapore Pte Ltd

Construction Period : March 1992 to December 1993

 
Scope of Work : Civil, Tankage, Mechanical, Piping, E & I Works; and Engineering Design Services
 
Location : Pulau Sakra, Singapore
 

BRIEF DESCRIPTION:

Engineering design services; civil works, tankage, mechanical and piping works, electrical and
instrumentation installation
Civil construction of tanks' foundation, truck loading and unloading building and the sub-station
building.
Fabrication and erection of stainless steel, carbon steel and fiberglass tanks. Mechanical
equipment installation and complete piping system for product and utilities system for product
and utilities system from the tank farm to jetties.
Electrical – installed complete power supplies from the sub-station to pumps and MOV motors
and all lighting and Fire Protection System.
Instrumentation work comprises the installation of DCS system on the control of the terminal's
equipment.

 

 

Van Ommeren Tank Terminal Pit 18 Project

  Client : Van Ommeren Tank Terminal (S) Pte Ltd


Owner: Van Ommeren Tank Terminal (S) Pte Ltd

Construction Period : January 1988 to June 1989

 
Scope of Work : Construction of new chemical Storage & stainless steel product transfer facilities
 
Location : Pulau Sebarok, Singapore
 

BRIEF DESCRIPTION:

Electrification of new pumps, lighting, close circuit TV, MOV, switches etc.
Fabricate, install and test piping system, pipe racks and pipe bridges, product transfer pipeline
systems (stainless steel) and utilities pipes (carbon steel).
Instrumentation services - Installation and calibration of tank Enraf gauging system.
Upgrading graphic panel in central control room.
Upgrade and integrate all field electrical instrument and mechanical equipment.
Fabricate and install local control station and generator container. Install and commission loading
pumps of 600-m3/hr and 200m3/hr capacities.
Replacement of existing pumps with new 600m_ /hr pumps with modification to existing
piping system to match

 