Construction Period : February 1997 to February 1998
Scope
of Work :
Detailed Engineering
Design, Supply of Materials, Equipments and Construction Works.
Location : Xiamen, China
BRIEF DESCRIPTION:
Turnkey contract inclusive of
detail engineering design, supply of material and
equipment and construction
of the following facilities;
ß Tankfarm:
Total storage Capacity is 100,000 cbm
5 storage tanks for class 3 product with associated
protection system,
instrumentation control system for tank level control and level
alarm system.
ß Pump Pad:
Pump Pad contains the main piping headers and valve
manifolds connecting
the piping from the tanks and existing jetty to the new pumps Truck
Loading Bay. The truck loading bays are designed with two
truck bays
complete with loading arms and flow meters, remote on/off switches
for the truck loading pumps.
ß Boiler House:
A boiler house and a 6.2 ton boiler were installed.