Rotary Engineering Limited

Projects Showcase

Chemical

Xiamen Storage Tank Terminal Phase II Project

Xiamen Storage Tank Terminal Phase II Project

Client:

Xiamen Paktank Company Limited

Owner:

Xiamen Paktank Company Limited

Construction Period:

February 1997 to February 1998

Scope of Work:

Detailed Engineering Design, Supply of Materials, Equipments and Construction Works.

Location:

Xiamen, China

Brief Description:

  • Turnkey contract inclusive of detail engineering design, supply of material and equipment and construction of the following facilities;
  • ß Tankfarm:
    Total storage Capacity is 100,000 cbm
    5 storage tanks for class 3 product with associated protection system, instrumentation control system for tank level control and level alarm system.
  • ß Pump Pad:
    Pump Pad contains the main piping headers and valve manifolds connecting the piping from the tanks and existing jetty to the new pumps Truck Loading Bay. The truck loading bays are designed with two truck bays complete with loading arms and flow meters, remote on/off switches for the truck loading pumps.
  • ß Boiler House:
    A boiler house and a 6.2 ton boiler were installed.