Van Ommeren Tank Terminal Pit 18 Project

Van Ommeren Tank Terminal Pit 18 Project

Client:

Van Ommeren Tank Terminal (S) Pte Ltd

Owner:

Van Ommeren Tank Terminal (S) Pte Ltd

Construction Period:

January 1988 to June 1989

Scope of Work:

Construction of new chemical Storage & stainless steel product transfer facilities

Location:

Pulau Sebarok, Singapore

Brief Description:

  • Electrification of new pumps, lighting, close circuit TV, MOV, switches etc.
  • Fabricate, install and test piping system, pipe racks and pipe bridges, product transfer pipeline systems (stainless steel) and utilities pipes (carbon steel).
  • Instrumentation services - Installation and calibration of tank Enraf gauging system.
  • Upgrading graphic panel in central control room.
  • Upgrade and integrate all field electrical instrument and mechanical equipment.
  • Fabricate and install local control station and generator container. Install and commission loading pumps of 600-m3/hr and 200m3/hr capacities.
  • Replacement of existing pumps with new 600m_ /hr pumps with modification to existing piping system to match